Your Mistbox control unit should be installed in the top right corner on any side panel of your AC unit. Make sure the control unit and the wind turbine are positioned close to each other.

Within the installation process in the Mistbox app, we recommend you remove the existing hex head screw from your AC with the wrench included in your Mistbox packaging and attach the mounting bracket with the screw and screwdriver also included.

If there is not a screw in the top right corner of a side panel, check for one on the adjacent corner. Remove the existing screw and attach the mounting bracket there.

If you are completely unable to access an existing screw location, secure the mounting bracket with zip ties. 

Did this answer your question?